B&C logo

Accuracy

LAMP logo

Flexibility

 

Accuracy

 

Efficiency

 

Viability

 

Security

 

LAMP promotes accuracy in the organisation by:

  • Providing the facility to vary the cost and charge rates by date effective

 

The cost rates can be varied by use of the date stamping facilities within LAMP to keep control of the component costs.

Charge methods that employ rate tables can have a variety of rates established with reference to an effective date thus allowing the charge rates to be adjusted periodically or varied in line with the cost rates.

 

< Back | Up | Next >